PROJECT LIST
Precinct 1 (New construction)
1. FM 1097 from Interstate 45 to Blueberry Hill, local participation. Cost: $8 million.
2. FM 1097 from Interstate 45 to Anderson Road, local participation. Cost: $5 million
3. FM 1097 Anderson Road to Lake Conroe Hills, local participation. Cost: $3 million
4. FM 1097 Lake Conroe Hills to Blueberry Hill, local participation. Cost: $2 million
5. Airport perimeter road, access to south property. Cost: $1 million
Precinct 1 (Rehab and widening)
6. Walden Road, entrance to Emerson. Cost: $6 million
7. Lone Star Parkway, Texas 105 east of Montgomery to Texas 105 west. Cost: $4 million
8. Willis-Waukegan Road, precinct line to FM 1484. Cost: $3 million
9. Mt. Mariah Road, Old Highway 105 to FM 1486. Cost: $3 million
10. Spring Branch Road, precinct line to Old Plantersville Road. Cost: $6 million
11. Calvary Road, Texas 75 to end. Cost: $5 million
12. Shepard Hill Road, Calvary to Interstate 45. Cost $5 million
13. Rogers Road, Mt. Zion to city limit. Cost: $4 million
14. Bays Chapel Road, FM 149 to William Hoke Road. Cost: $4 million
15. Longstreet Road, Interstate 45 to FM 1097. Cost: $3 million
16. Bois D’Arc, Conroe city limit to Lone Star Bend. Cost: $1.5 million
17. Walden Road at Grand Harbor Boulevard. Cost: $500,000
18. Willis Loop Road, FM 1097 to Old Montgomery Road. Cost: $1 million
19. Airport entrance, Deison Parkway to FSS Road. Cost: $1 million
20. Cude Cemetery Road, FM 830 to Lake Conroe. Cost: $1.5 million
21. Deison Parkway, Fm 1484 to Airport Road. Cost: $1 million
22. Miscellaneous street repair. Cost: $11 million
Precinct 2 (New construction)
1. Woodlands Parkway extension to Texas 249. Cost: $22 million
2. Nichols Sawmill Road extension. Cost: $9.7 million
3. Fish Creek Thoroughfare. Cost: $17.3 million
4. Research Forest. Cost: $8 million
5. FM 1774 overpass at FM 1488. Cost $5 million
6. Magnolia Bypass. Cost: $10 million (matching funds)
Precinct 2 (Connectivity improvements)
7. Texas 242 at Gosling Road, add turn lane. Cost: $636,000
8. Texas 242 at Greenbridge Drive, add turn lane. Cost: $137,000
9. FM 1488 at Kuykendahl, add turn lane. Cost: $613,000
Precinct 2 (Rehab/resurface. Total cost of all projects: $6.6 million)
10. Old Hockley
11. Coe Loop
12. Decker Prairie Rosehill
13. Hardin Store
14. Dobbin Huffsmith
15. Nichols Sawmill
16. Old Hempstead Road
17. Honea Egypt
18. Roberts Cemetery
19. Pine Lake Road
20. Mail Route Road
21. Old Highway 105
22. Rabon Chapel
23. Spring Branch Road
24. Goodson Loop
Precinct 3 (New construction)
1. Rayford Road railroad-Texas 99 and Overpass at railroad – widen to six lanes. Cost – $60 million
2. Woodlands Parkway westbound direct connection – Grogans Mill to Interstate 45. Cost – $25.25 million
3. Robinson road, realign and widen to four lands from Interstate 45 to railroad. Cost – $8 million
4. Gosling Road bridge. Cost- $3.8 million
5. Precinct wide signal and intersection improvements and overlays. Cost – $3.1 million
6. Widen Lake Woodlands Drive from east of Lake Front Circle to Interstate 45 to six lanes. Cost – $2.6 million
7. Add fourth westbound land to Woodlands Parkway from Woodloch to Grogans Mill. Cost – $2.2 million
Precinct 4 (New construction)
1. Texas 105, widen to four lanes from Loop 336 to San Jacinto County Line, local participation. Cost: $23.5 million
2. FM 1314, Texas 242 bridge widening, local participation. Cost: $4.7 million
3. Texas 242, widen to four lanes from Needham Road to FM 1314, with bridge at San Jacinto River, local participation. Cost $12.6 million
4. FM 1485, eastbound turn land at Interstate 69, local participation. Cost: $300,000
5. Gene Campbell Road, overlay with ditches. Cost: $1.5 million
6. Old Houston Road, from Texas 242 to FM 3083. Cost: $1.9 million
7. Sorters Road, from FM 1314 to Kingwood Drive, widen to four lanes. Cost: $17.2 million
8. David Memorial, Shenandoah Park Drive to Texas 242. Cost: $2 million
9. Galaxy Boulevard, rehab and extension from FM 1485 to Roman Forest Boulevard. Cost: $2 million
10. Willaby Road, rehab and widening from FM 1485 to Shire Drive. Cost: $1 million
11. Tamina Road, widen to four lands from David Memorial to Main Street. Cost: $4.2 million
12. Main Street, overlay, maintain ditches. Cost: $300,000
13. Bennette Estates, overlay, maintain ditches. Cost: $1.2 million
14. Crystal Forest, overlay, maintain ditches. Cost: $100,000
15. Deerwood, overlay, maintain ditches. Cost: $1.5 million
16. Texaba, overlay, maintain ditches. Cost: $2.2 million
17. Peach Creek Forest, overlay, maintain ditches. Cost: $1.1 million
18. Trade Center Parkway, spot repair and overlay from Texas 242 to Harpers Landing. Cost: $1.8 million
Precinct 4 (Drainage projects)
19. Allendale, Lake Circle to west end Allendale. Cost: $500,000
20. River Oaks, Needham Road to east end. Cost: $1 million
Precinct 4 (Studies, preliminary, engineering)
21. FM 1485, Kidd Cemetery Road to Texas 242. Cost: $1.4 million
22. Porter Lane drainage project: Cost: $250,000
23. Ford Road, US 59 to Harris County line. Cost: $2 million
24. Tamina Community drainage study. Cost: $150,000