24 Hour Construction Schedule
Saturday, August 29

Real-Time Lane Closure Status: Active     Inactive

EAST SAM HOUSTON TOLLWAY


Northbound from SH-225 to SHIP CHANNEL BRIDGE PLAZA. 1 LEFT LANE. Closed continuously from 10:00 PM, Friday, August 28 to 5:00 AM, Monday, August 31.  


Southbound from JACINTO PORT BLVD to SH-225. TOTAL CLOSURE OF THE SOUTHBOUND LANES. TOTAL CLOSURE OF THE CONNECTOR RAMP FROM EASTBOUND AND WESTBOUND IH-10 TO EAST SAM SOUTHBOUND. Closed continuously from 10:00 PM, Friday, August 28 to 5:00 AM, Monday, August 31. DETOUR: Traffic will be detour to IH610.  

HARDY TOLL ROAD


Northbound from FM-1960 to IH-45 NORTH. TOTAL CLOSURE OF MAIN LANES AND FM-1960 ON RAMP NORTHBOUND. Closed continuously from 10:00 PM, Friday, August 28 to 5:00 AM, Monday, August 31.  


Southbound from IH-45 NORTH to FM-1960. TOTAL CLOSURE OF MAIN LANES AND FOLLOWING SOUTHBOUND RAMPS: IH-45 CONN RAMP, NORTHGATE ON RAMP, RILEY FUZZEL ON RAMP, NORTHGATE CROSSING ON RAMP. Closed nightly 10:00 PM to 5:00 AM from Friday, August 28 to Monday, August 31.  

NORTH SAM HOUSTON TOLLWAY


Westbound Entrance Ramp from SH-249 TOMBALL PARKWAY. TOTAL CLOSURE OF ENTRANCE RMP. Closed on Saturday, August 29 from 3:00 AM to 6:00 PM. C-800-8.29.15-1258.  

WEST SAM HOUSTON TOLLWAY


Northbound from BRIAR FOREST DR to SOUTH SAM PLAZA. RIGHT LANES. Closed continuously from 10:00 PM, Friday, August 28 to 5:00 AM, Monday, August 31. 2 LEFT LANES WILL BE OPEN.  


Southbound Entrance Ramp from BELLAIRE BLVD. ON RAMP CLOSED. Closed continuously from 9:00 PM, Friday, August 28 to 5:00 AM, Monday, August 31.  


Southbound Exit Ramp. TOTAL CLOSURE OF RAMP. Closed on Saturday, August 29 from 7:00 AM to 7:00 PM. O-8.29.15-1289.  